This Leslieville bathroom renovation required cosmetic and structural upgrade. The old bathtub was installed incorrectly sloping down the floor which resulted in the water spilling on the tiles and penetrating through the grout lines down. This bathroom renovation project required partial demolition since old walls were in good shape.
The Easy Bathroom team installed new bath tub with partition wall that could be used as a bench or a shelf for shampoos, two new pot lights, new single slider window, new white subway style ceramic tiles around bathtub and porcelain on the floor, new vanity and a toilet, new fixtures and accessories. Overall – a modern, slick look with a hint of antique.